- Q1a- How will you plan and takeover a vessel safely from shipyard?
- Q1- New vessel takeover, yard checks as CE ?
- Q3- Tail shaft seal replacement.
- Q2- How to do Propeller repair that has suffered a crack? Which zones are allowed to be repaired?
- Q22- How to order spares and receive and store them safely for DD?
- Q17- CIF
- Q21- DryDock Safety?
- Q13- Tailshaft survey requirement. Checks and removal, which kind of bolts, significance of these bolts?
- Q4- Which type of steel is used for vessel construction? HTS steel, benefits and problems.
- Q19- How to do drydock firefighting?
- Q8- IWS requirements, how to carry out?
- Q14- Steel grades, composition. Why tensile steel ? What for low temp?
- Q16- EDD scheme.
- Q7- DryDock requirements as per SOLAS?
- Q10- Can you certify a fitter for 6g welding? Details of workpiece? A -
- Q20- Paint Scheme Latest amendments?
- Q18- TSM notation. Contents of TSM file. Diff bet TMON & TSM
- Q15- Steel renewal plan. How to plan? How to order steel? We have area for steel sheets but has to be ordered in tonnes, how to ensure correct size is ordered?
- Q12- Docking Plan and Paint Scheme contents.
- Q11- DryDock Preparation as CE.
- Q9- Ship side crack above waterline, how to weld? Welding process?
- Q23- Paint requirements, how to order paint? Thickness of paint? How to measure?
- Q24- Recommendation to office for paints prior going for DD in view of fuel consumption?
- Q25- DD specs for anchor windlass. Windlass has single shaft or multi shaft?
- Q38 – Coating types as per ESP code
- Q35- DD Checks in Shore connection box?
- Q26- Ship is going for layup, action as CE ? Documentatn and manning level requirements?
- Q26a – Cold Ironing?
- Q38a – Coating Condition as per ESP code
- Q30- Important Checks during DD? Drydock Checks
- Q36- Vessel came out of DD and not picking up speed?
- Q33- Imp intstructions for staff when vessel sits on keel blocks?
- Q40- What Propeller checks you will do on sections where the cavitation can be more in Propeller?
- Q37- Which instrument is checked for checking shaft alignment?
- Q34- Statutory items checked by C/E in DD?
- Q31- Why Crankshaft deflection is taken before and after DD?
- Q39- DryDock Checks before and after flooding?
- Q28- DryDock plans and drawings?
- Q27- Navigation tests in Sea trial?
- Q32- Vessel came out of DD and fuel consumption increased, reasons?
- Q30a – Drydock types?
- Q29- Test bed trial?
- Q41- Important Checks to rudder and Propeller in a DD?
- Q42- Propeller checks at retrofitting? P Propeller tip broke, how to repair?
- After drydock what things to check
- Dry dock, dry docking preparation
- 24 hrs before departure DD, C/E checks
- Criticality during Dry docking? As CE what you must do?