MEOClassOneAll oral topicsWritten study desk

MEO CLASS 1 · ORAL PREPARATION

Planned Maintenance System (PMS) & RCM

9 questions. Select a question to read its answer.

  1. Reliability Centered Maintenance (RCM)
  2. why RCM is better than rh or preventive maintenance
  3. How to make PMS For vessel?? how to prioritize the jobs??
  4. Condition monitoring
  5. Qualification of CE to carry out open-up survey in Continous survey of Machinery ?
  6. Critical spares - definition, how is critical spares decided - I answered from sms, then I told about FMECA analysis method, but he was expecting something else
  7. Critical Equipment and Spares List: Who Will Prepare
  8. You are on brand new ship , superintendent give you 300 equipment and said separate these equipment on basis of PMS and Condition monitoring. On what basis will you separate these?
  9. Critical Spare Found Onboard but Missing from SMS Master List
← All oral topics