You are on brand new ship , superintendent give you 300 equipment and said separate these equipment on basis of PMS and Condition monitoring. On what basis will you separate these?

Answer

To categorize a large list of machinery on a new vessel, you should prioritize equipment criticality, failure modes, and the availability of analytical tools.

                                     [300 New Ship Equipments]

                                                              │

┌───────────────────────┴───────────────────────┐

▼                                                                                                                         ▼

[Planned Maintenance System - PMS]                                                 [Condition Monitoring - CM]

- Time or running-hour based intervals.                                    - Real-time or periodic parameter trends.

- Regulated/statutory gear.                                                       - Heavy rotating continuous machinery.

- Non-measurable/static items.                                                - Measurable failure modes (vibration/temp).

Criteria for Planned Maintenance System (PMS) Allocation

Allocate equipment to time- or running-hour-based intervals if they meet these profiles:

Criteria for Condition Monitoring (CM) Allocation

Allocate machinery to Condition Monitoring if its operational health can be measured through non-destructive, repeatable diagnostic metrics: