MEO CLASS 1 · ORAL QUESTION 12

how to implement esp survey complete details

Answer

The Enhanced Survey Programme (ESP) is a mandatory structural inspection framework under SOLAS Regulation XI-1/2 and the IMO ESP Code (Resolution A.1049(27), as amended). It applies specifically to Bulk Carriers (single and double side skin) and Oil Tankers (crude oil, product, and chemical tankers).

Step-by-Step Implementation Protocol

1. Preparation of Survey Programme & Questionnaire: Statutory Planning Phase (At least 6 months prior).

2. Tank/Hold Cleaning, Gas-Freeing & Access Setup: Safety, Cleaning, and Access Control.

3.3. Execution of Overall & Close-Up Surveys: Visual Examination at Close Proximity.

4.4. Ultrasonic Thickness Measurement (UTM) & NDT: Gauging Steel Diminution.

5.5. Condition Evaluation Report (CER) & Endorsement: Statutory Documentation & Certification.

To implement ESP, I will first review previous survey and thickness reports, corrosion history and outstanding class recommendations. A survey-planning questionnaire and Survey Programme are prepared with class identifying tanks, cargo holds, close-up areas, thickness-measurement locations and tank tests. The spaces are cleaned, gas-freed, ventilated and provided with safe access. The surveyor carries out overall and close-up examination, and an approved firm conducts ultrasonic thickness measurement. If substantial corrosion or structural defects are identified, the extent of gauging and close-up survey is increased. Required steel renewal or repairs are carried out under class approval, followed by NDT and tank testing. Finally class verifies repairs and completes the ESP survey documentation.