MEOClassOneAll oral topicsWritten study desk

MEO CLASS 1 · ORAL QUESTION 1

CSM survey *what ce can't carry *procedure for csm survey credit

Answer

In CSM, machinery items forming part of the machinery special survey are distributed over a 5-year cycle, normally about 20% each year, so that the interval between consecutive examinations of an item does not exceed five years. Certain items may be examined by the Chief Engineer, but final survey credit is subject to Class confirmatory survey. the exact CE-creditable list can vary by classification society and vessel,

Items the Chief Engineer CANNOT Carry Out/Survey for Class Credit

Classification Society rules explicitly restrict the Chief Engineer from surveying the following items, requiring direct attendance by a Class Surveyor:

Procedure for obtaining CSM credit for work done by CE

  1. Company/Owner obtains Class acceptance for CE examination of eligible CSM items.
  2. CE checks that the item is actually approved for CE survey credit.
  3. Machinery is opened up sufficiently for meaningful examination.
  4. CE inspects condition and takes all required clearances, wear-downs and measurements according to maker's limits.
  5. Any defect is corrected; defective parts are renewed with acceptable/OEM or authorised parts as required.
  6. After reassembly, the machinery is tested under running condition and satisfactory operation confirmed.
  7. CE keeps full documentation: overhaul report, measurements, calibration records, parts renewed, certificates/traceability of spares, photographs where appropriate, and machinery performance records. Removed/replaced parts should be retained for Surveyor examination when required.
  8. CE completes and signs the Declaration of Examination of Surveyable Machinery Items and the detailed opening-up inspection report.
  9. At the next suitable port, the Class Surveyor attends for confirmatory survey.
  10. Surveyor reviews the records, examines the machinery in operation where practical, and may test alarms, controls and safeguards.
  11. If satisfied, the Surveyor credits the CSM item. If not satisfied, he can require the machinery to be opened again for detailed examination.