As a CE, what is your strategy and action wrt Annex VI when you join?

Answer

As Chief Engineer, on joining I would first verify that the ship is continuously compliant with MARPOL Annex VI and that all machinery, fuel, records, and certificates support that compliance.

My strategy and actions
  1. Check statutory certificates

    • IAPP Certificate
    • EIAPP certificates for applicable diesel engines
    • IEEC
    • SEEMP Part I/II/III as applicable
    • Record of Construction and equipment attached to certificates.
  2. Check fuel compliance

    • Verify present fuel sulphur content:
      • 0.50% m/m globally
      • 0.10% m/m in SOx ECAs
    • Check BDNs, bunker samples and retention period.
    • Verify fuel changeover procedure and records.
    • Check any scrubber/EGCS if fitted.
  3. Check NOx compliance

    • Verify engines are operating as per NOx Technical File.
    • Check critical components, settings and records.
    • For Tier III ships, confirm SCR/EGR system readiness in NOx ECAs.
  4. Check ODS and refrigerants

    • Verify ODS Record Book.
    • Check refrigerant inventory, leaks and maintenance.
    • Ensure prohibited deliberate release is avoided.
  5. Check incinerator

    • Confirm IMO-approved incinerator where applicable.
    • Check operating limits and records.
    • Ensure prohibited materials are not incinerated.
  6. Energy-efficiency compliance

    • Check EEXI/EPL or SHaPoLi arrangements if applicable.
    • Verify EPL seals/settings and override records.
    • Review CII status and SEEMP Part III corrective actions, if applicable.
    • Monitor fuel consumption and energy-efficiency performance.
  7. Fuel consumption data

    • Verify IMO DCS data collection arrangements.
    • Check fuel flowmeters/tank soundings and reporting accuracy.
    • Ensure annual fuel-consumption data is properly recorded.
  8. Physical inspection

    • Inspect fuel system, changeover arrangements, sampling points, EGCS/SCR/EGR, incinerator and refrigeration plant.
    • Confirm no unauthorized modifications have been made.