Answer
A – 1. Report an NC.
2. enter in defect list
3. RCA
4. CA/ PA
5. Implementation within 3 months
6. Next Scheduled Audit
As a CE, look for alternatives for the equipment, get in touch with tech mgt/ local workshops approved by Maker/ Shore service providers/ Class to seek assistance in forming Corrective action.
Critical equipment is an Equipment, which if fails can result in hazardous situation. Element 10.3
[NOTE: Main Engine liner is mentioned as Critical spare as per IACS 26 guidelines and OCIMF. We must have Critical spares as per these guidelines]