MEOClassOneAll oral topicsWritten study desk

MEO CLASS 1 · ORAL QUESTION 93

Documentation check after taking over as ch eng.

Answer

Upon taking over a vessel, the incoming Chief Engineer must systematically review statutory certificates, engine room logs, technical files, and PMS status to verify full regulatory and operational compliance.

Category

Documents & Registers Checked

Key Audit Points

Statutory Certificates

• IOPP Certificate & Form B

• IAPP Certificate & Supplement

• EIAPP Certificates & Technical Files

• ISPP Certificate

• International BWM Certificate

Expiry dates, annual/intermediate endorsement stamps, RO survey reports, engine parameter check methods.

Mandatory Logbooks

• Oil Record Book (ORB) Part I

• Engine Room Logbook

• Garbage Record Book Part I & II

• ODS Logbook

• Fuel Oil Changeover Logbook

• Bio-fouling & Ballast Water Logs

Correct code entries, matching tank soundings, signatures of C/E on ORB pages, no missing pages or unverified transfers.

D ecarbonization & Energy

• SEEMP Part I, II, & III (CII)

• EEDI / EEXI Technical File

• Shaft Power Limitation (SHaPoLi) / Engine Power Limitation (EPL) file

Verified Onboard Management Plan for CII compliance, override sealed status for EPL/SHaPoLi.

Operational & Safety Plans

• SOPEP / SMPEP Plan

• Approved Bunker Transfer Procedures

• Contingency Plans for Machinery Failure

Flag approval stamps, emergency contact lists updated (DPA, coastal states, P&I).

PMS & Maintenance Records

• Planned Maintenance System (PMS) database

• Survey Status / Continuous Machinery Survey (CMS)

• Critical Equipment Spares Inventory

Overdue critical jobs, class survey due dates, status of main engine/auxiliary engine running hours, minimum mandatory spares on board.