Answer
IOPP = International Oil Pollution Prevention Certificate.
The IOPP Survey ensures compliance with MARPOL Annex I (Regulations for the Prevention of Pollution by Oil).
Upon successful completion of the survey, an International Oil Pollution Prevention Certificate is issued, supplemented by Form A (for non-tankers) or Form B (for oil tankers).
Under the Harmonized System of Survey and Certification, the IOPP certification regime includes:
- Initial Survey: Before the ship is put into service or before the certificate is issued for the first time.
- Annual Survey: Within ± 3 months of each anniversary date of the certificate.
- Intermediate Survey: Within ±3 months before or after the 2nd or 3rd anniversary date (replaces one annual survey).
- Renewal Survey: Conducted at 5-year intervals to reissue the IOPP Certificate.
- Additional Survey: Required after significant repairs, structural alterations, or equipment replacements resulting from damage.
Chief Engineer's Checklist for IOPP Survey
1. 15 PPM Oily Water Separator (OWS) & 15 PPM Alarm
- Verify 15 PPM Bilge Alarm calibration certificate (valid for 5 years per MEPC.107(49)).
- Test the auto-stop device / 3-way valve system: Inject clean water / high-turbidity sample to trigger the alarm (> 15 ppm) and verify the 3-way valve immediately diverts flow back to the bilge holding tank.
- Ensure sample line contains clean water flushing arrangements and is free of oil contamination/bypass taps.
- Inspect anti-tampering seals on memory recorder units.
2. Oil Record Book (ORB Part I & Part II)
- ORB Part I (Machinery Space Operations): Cross-check entries against engine room logbook, soundings log, and OWS memory data (Code C, D, E, F, G, H entries).
- Verify zero discrepancies between recorded sludge volumes, incinerator burning hours, and ashore reception facility receipts.
- ORB Part II (Cargo/Ballast Operations - Tankers): Verify ODME records and cargo tank washing logs.
3. Oil Discharge Monitoring and Control System (ODME) - Tankers
- Test flow meters, oil content meters, computing units, and ship speed/GPS inputs.
- Confirm automatic overboard valve shut-off triggers when discharge exceeds 30 liters per nautical mile or total quantity exceeds 1/30,000 of total cargo volume (for new tankers).
4. Sludge, Bilge & Fuel Systems Isolation
- Verify sludge pump discharge piping leads only to the standard discharge connection or incinerator/boiler sludge burners—no connection to overboard lines.
- Inspect standard discharge connection dimensions (flange thickness, bolt holes, gaskets according to MARPOL Annex I Reg. 13).
Direct Comparison: Form A vs. Form B
Parameter / Requirement | Form A | Form B |
|---|---|---|
Applicable Vessel Type | Ships other than oil tankers | Oil Tankers (Crude, Product, Combination) |
Tonnage Threshold | ≥400 GT | ≥ 150 GT (Cargo Area) / ≥400 GT (Machinery) |
Machinery Bilge & OWS (Reg. 14) | Included | Included |
Sludge Tank Capacities (Reg. 12) | Included | Included |
Standard Discharge Connection (Reg. 13) | Included | Included |
Slop Tanks & ODME System (Reg. 29/31) | Not Applicable | Included |
Oil/Water Interface Detectors (Reg. 32) | Not Applicable | Included |
SBT & COW Systems (Reg. 18/33) | Not Applicable | Included |
Double Hull Construction (Reg. 19–21) | Not Applicable | Included |