MEOClassOneAll oral topicsWritten study desk

MEO CLASS 1 · ORAL QUESTION 2

Q1a- BWM Latest amendments. BW Convention, why not ratified in India?

Answer

A – Latest-
1.Guidelines for BWTS Operation in challenging water.

2.Treated sewage / grey water can be stored in the Ballast Water tanks if required with entry in BWRB, and later the discharge to comply with Annex 4 discharge criteria
[Note: Dmax = 0.000926VDB]
3.E- Ballast Water Record books can be used, editorial change in the BWM convention, Regulation A1 and B2. Wef 1 Oct 2025.

4.New format stating codification of BWRB wef 1 Feb 2025.

5.Guidance for modifications for type approved BWTS.

BWM Convention EIF criteria- 30 states, comprising not less than 35% of world’s tonnage.

1.All new vessels built after 8 Sept 2017 should comply with D 2 standards.

2.All existing ships for whom their 1st IOPP renewal survey lies between 8 Sept 2017- 8 Sept 2019 can comply with D 2 standards after their 2nd IOPP renewal survey.

3.All existing ships for whom their 1st IOPP renewal survey lies after 8 Sept 2019 must comply with D 2 standardsafter their 1st IOPP renewal survey.

4.All ships should comply before 8 Sept 2024.

Why BWM not ratified in India-

1.Area for BW exchange not dedicated.

2.Reception facilities not available.

3.Not feasible to install for small shipowners.