MEOClassOneAll oral topicsWritten study desk

MEO CLASS 1 · ORAL QUESTION 6

How to prep for a 30 year old vsl for honkong convention, Want to know practical as ce simple answers , how will you make Hazardous Inventory list when you don't have anything available to you- what is one document on all ships that can be used for this

Answer

With the Hong Kong International Convention (HKC) officially entering into force on June 26, 2025, port state controls are actively enforcing compliance. For an existing, 30-year-old vessel, you do not need to panic about immediate dismantling, but you must have the vessel certified to operate legally.

As the Chief Engineer, your practical focus is divided into two distinct parts: Maintaining the Operational IHM Certificate and Preparing the Vessel if it is Heading for the Recycling Yard.

Part 1: Operational Compliance (If the vessel is keeping on trading)

Existing ships have a grace period until June 26, 2030 to have a fully certified IHM on board, or it must be done at the first renewal survey after June 26, 2025.

1. The IHM Part I Book (Your Primary Responsibility)

2. Implementation into the SMS (Engine Room Management)

Part 2: If the Vessel is Heading for Final Recycling (Scrapping)

If the 30-year-old vessel is being sold for scrap, your job shifts significantly. You must transition the ship from an operational status to a "Ready for Recycling" status.

1. Compile Parts II and III of the IHM

While trading, you only needed Part I (fixed structure). For recycling, you must compile:

2. Practical Tank & System Preparation (Engine Room)

3. The Final Certificates

Before the vessel sails on its final voyage to an authorized recycling yard (holding a valid DASR – Document of Authorization for Ship Recycling), you must have:

CE Exam Golden Rules (MEO Class 1 Focus)

  1. Legislation: The Hong Kong Convention applies to all vessels > 500 GT.

  2. Maintenance: My practical duty as CE is the continuous maintenance of IHM Part I via MDs and SDoCs for all incoming spares and machinery.

  3. Prohibition: Zero tolerance for bringing asbestos-containing materials or prohibited ozone-depleting substances on board.

The One Document Found on All Ships to Use as a Baseline:

In formal IHM preparation, the General Arrangement Plan is normally the preferred overall base plan, supplemented by the Fire Control Plan, machinery arrangement, insulation plan and piping diagrams. The IMO guideline lists both tEvery ship has a GA plan prominently displayed and inside its stability booklet. This plan maps out every bulk compartment, tank, accommodation space, and machinery zone, allowing the surveyor to systematically plot where hazardous items are located and build the sampling matrix.