MEOClassOneAll oral topicsWritten study desk

MEO CLASS 1 · ORAL QUESTION 14

Csm survey what Ch eng cannot inspect.

Answer

Under the Continuous Survey of Machinery (CMS) scheme, Classification Societies (such as IRS, LR, DNV, and ClassNK) allow a qualified Chief Engineer to open up and inspect specific machinery items to distribute the 5-year special survey workload.

However, there is a strict regulatory boundary. The following list details what the Chief Engineer CANNOT inspect or credit under CMS; these items must be physically examined and certified exclusively by an attending Class Surveyor.

1. Main Propulsion and Power Transmission

2. Boilers and High-Pressure Plant

3. Electrical and Automation Control Systems

4. Hull and Underwater Fittings

5. Overriding Disqualifications (When the CE's Authority is Void)

Even for items normally acceptable for a Chief Engineer to survey (e.g., auxiliary pumps or air compressors), the Chief Engineer cannot carry out the inspection if:

MEO Class 1 Exam Tip

If the examiner asks "Why are these items excluded?", state that these components directly affect the structural integrity, primary redundancy, and core safety of the vessel. Class mandates a third-party, independent verification (Class Surveyor) to eliminate risk on single-point-of-failure machinery. Additionally, all items surveyed by you must face a Confirmatory Survey by the surveyor within a designated window (usually 3 to 5 months) to be officially credited.