MEOClassOneAll oral topicsWritten study desk

MEO CLASS 1 · ORAL QUESTION 4

PR17??

Answer

In the context of management-level maritime administration and Classification Society audits, PR 17 stands for Procedural Requirement No. 17, established by the International Association of Classification Societies (IACS).

Its official title is: "Reporting on deficiencies possibly affecting the implementation of the ISM Code on board."

1. What is the Purpose of IACS PR 17?

Normally, class surveyors perform technical inspections (e.g., Annual Machinery Surveys, Statutory Pollutions Surveys) while separate ISM auditors verify the Safety Management Certificate (SMC).

However, under PR 17, if a Class Surveyor (who is not currently conducting an ISM audit) notices defects that suggest the ship’s crew is failing to implement their SMS properly, they are legally mandated to file a formal PR 17 Report. This report is sent directly to the Classification Society or Flag State department responsible for the vessel's ISM certification to trigger further administrative or physical action (such as an occasional additional ISM audit).

2. What Triggers a PR 17 Report?

A surveyor will not issue a PR 17 for normal wear and tear or a single isolated defect that the crew is already actively repairing. It is triggered by systemic breakdowns categorized into four distinct areas:

A. Technical Deficiencies

B. Operational Deficiencies

C. Documentation Deficiencies

D. Other Deficiencies

3. When is a PR 17 Report Not Issued?

The surveyor will explicitly omit a PR 17 report under the following conditions:

4. How to Explain PR 17 in an MMD Oral Exam

If an Indian MMD surveyor asks you: "Chief, what is IACS PR 17 and how does it affect your engine room management?"

Your structured verbal response should be:

"Sir, IACS PR 17 is a mandatory procedural requirement that dictates how class surveyors report shipboard deficiencies that point toward a breakdown in the implementation of the ISM Code.

As a Class 1 Engineer, I am aware that if a class surveyor notes multiple critical technical failures—such as an inoperable emergency fire pump during an annual survey, or severe, unaddressed oil accumulation in the bilges—they will conclude that our Planned Maintenance System is failing. Under PR 17, they will file an official report to the organization that issued our Safety Management Certificate, which could lead to an additional, unscheduled ISM audit or the suspension of our certificates.

To prevent a PR 17 trigger, my management strategy is to ensure that any machinery defect or operational breakdown is immediately identified, safely mitigated, and officially logged as an SMS non-conformity before the surveyor or Port State Control boards the vessel. This demonstrates that our Safety Management System is actively working and self-correcting."