MEOClassOneAll oral topicsWritten study desk

MEO CLASS 1 · ORAL QUESTION 19

after joining a ship as CE suddenly near misses increased, action as CE ??

Answer

As a Class 1 Chief Engineer, your first realization must be that an increase in reported near misses is actually a positive indicator of a healthy Safety Management System (SMS). It usually means the engine room crew feels safe, motivated, and trust your leadership enough to report hazards that were previously swept under the carpet.

However, you must systematically analyze the situation to ensure it is a rise in reporting and not an actual degradation of safety standards. Here is your structured action plan for the surveyor:

Phase 1: Analyze the Data (The "Why")

Before jumping to conclusions, look at the nature of the near-miss reports:

Phase 2: Crew Engagement & Establishing a "Just Culture"

Your leadership style sets the tone for the entire department. You must reinforce safety behavior immediately.

  1. Call an Extraordinary Engine Safety Meeting

Set expectations openly

Gather the entire engine department. Praise the crew for reporting the near misses. Explicitly state that you appreciate their vigilance and that near-miss reporting will never lead to blame or punishment (reinforcing an ISM "Just Culture").

  1. Conduct Intensive Engine Room Walkthroughs

Verify the floor-level reality

Personally inspect the workshops, steering gear room, purifier room, and tank tops. Look for physical catalysts for near misses: poor housekeeping, missing machinery guards, bypassed safety interlocks, or oil puddles.

  1. Review Toolbox Talks and Risk Assessments

Address the human element

Monitor how the Second Engineer and watchkeepers conduct Tool Box Talks (TBT) and Risk Assessments before jobs. Ensure they aren't just treating them as paperwork ("tick-box exercise") but are actually discussing real hazards.

Phase 3: Operational & Technical Interventions

If the analysis in Phase 1 reveals that the near misses are due to a genuine drop in operational standards or technical failures, execute target corrections:

Phase 4: SMS Integration & Reporting

Under ISM Code Element 9 (Reports and analysis of non-conformities, accidents, and hazardous occurrences), you must close the loop with the office:

"A near miss is a free lesson. Investigating a near miss costs nothing; investigating an accident costs a career or a life."